Leviathan Gas Platform

Leviathan Gas Platform

Project Name

Leviathan Gas Platform

Project Owner

Noble Energy / Heerema

Location

HFG / Mediterranean

Scope

E&I cabling and containment to flare boom; incl. instrumentation and equipment, power and control equipment, earthing, lighting, small power. Procurement, Installation, Inspection and Testing.

Project Overview: The Leviathan Production Platform (LPP) will develop the Leviathan Field, which holds 33 Tcf of natural gas resources in place (22 Tcf recoverable) and is one of the largest natural gas finds in the world in the last decade.
Project Executed by Eastgate Engineering Key Personnel

Related Projects